User Tools

Site Tools


2.golfswingai:1.todos

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
2.golfswingai:1.todos [2026/05/09 15:11] – created mvq4ri2.golfswingai:1.todos [2026/05/13 12:42] (current) mvq4ri
Line 1: Line 1:
 todo list here todo list here
  
-work load +day1 poc -gemini screen captures \\ 
 +day2 build - google ai studiocame out like nothing.  \\
  
-day1 poc - screen captures  +day3 wrapper page -html took more time then expected.  \\ 
-day2 build - came out like nothing.  +day4 finish up content, ad material. 
-day3 wrapper page - took more time then expected.  +Contents - how this built pages. Install ms code for html work?  
-day4 finish up content, ad material. +Set up for took longer than expected. 
 +Actually losing time on PC fix ( space issue ) , setting up VS code FTP 
 +done 05/11 
  
 +Day5 May 12 tues
 +Add banner advertiesement on our pages. Done. Need approval by Google. Added privacy policy created by gemini.
 +Google adsense added gemini helped how tos. Also worked some updates on docuwiki
  
 +Day6 May 13 
 +This was plan
 +Buy traffic from Google. Need to provide additional materials?
 +This makes one cycle.
 +But gemini suggests TikTok post fist. Sounds good.
 +https://g.co/gemini/share/6548e6288c1f
 +but worked this jigsawpuzzle.com sidebar order fixed
 +{{:2.golfswingai:sidebar-screenshot073928.png?250|}}
 +this time with chatGPT
 +https://chatgpt.com/share/6a047160-0e88-83ea-89a4-0d5fce6e5f55
 +
 +Next cycle
 +Add more material or blogger that points this project which has ad too. Synagogue.
 +
 +Every day monitor and token use.
 +P and L
2.golfswingai/1.todos.1778339490.txt.gz · Last modified: by mvq4ri